Fault and Root-Cause Analysis
Alarm history, device state, electrical measurements, software behaviour and process impact are evaluated together.
Technical transformation that reduces downtime risk and extends lifecycle
We assess installed automation through fault history, product lifecycle, spare availability and current production objectives.

Scope, interfaces and acceptance criteria are defined before implementation.
Installed automation systems can become operational risks as products age, spare parts become scarce, software access changes, networks require stronger security or capacity needs increase. Identifying dependencies before an emergency failure reduces production exposure.
Maintenance and retrofit work can review fault history, backups, device parameters, panel condition, communication and process behaviour. A modernization plan addresses retained functions, required improvements, new hardware and software compatibility, field-cable adaptation, testing and rollback strategy.
Each work package can be selected separately or combined into a complete project.
A transparent scope supports technical quality, schedule control and maintainability.
The exact workflow is adapted to the installed system, production risk and agreed responsibility boundary.
Process, performance targets, available documents, site conditions and responsibility boundaries are clarified.
Functions, architecture, products, test methods, deliverables, risks and implementation timing are prepared.
Design, software or manufacturing work is executed with controlled versions and checklists.
Connections, devices, communication, functions, safety chains and process scenarios are tested.
Current documents, backups, test records and follow-up recommendations are delivered and support scope is defined.
Review connected disciplines before finalizing the project scope.
Practical answers about project preparation, compatibility, testing and delivery.
Product lifecycle, fault frequency, spare availability, software access, capacity needs and production-loss risk are considered together.
A partial migration may be possible when communication protocols, data structures, electrical compatibility and existing software access allow it.
Access, device condition and available documentation are reviewed first. Online upload may be possible on some platforms; otherwise functions may need to be reconstructed from the field.
Front-end engineering, offline software, prepared adapters and cables, simulation, redundancy and staged migration are selected to suit the project.
Depending on scope, findings, completed actions, changed parameters, recommendations, critical spares and follow-up items can be documented.
Share available drawings, product references, photographs, fault records and target performance.
A suitable scope, required preliminary checks and the information needed for a technical quotation can then be defined.